Difference between revisions of "1D Gates"
Jump to navigation
Jump to search
Rohan.king (talk | contribs) m |
Rohan.king (talk | contribs) m (→Introduction) |
||
Line 4: | Line 4: | ||
<br> | <br> | ||
=Introduction= | =Introduction= | ||
− | There are a variety gate configurations that can be modeled within TUFLOW including operational | + | There are a variety gate configurations that can be modeled within TUFLOW including operational gate structures. |
<br> | <br> | ||
*See Mitch’s document for sluice | *See Mitch’s document for sluice |
Revision as of 00:29, 12 March 2016
Page Under Construction
Introduction
There are a variety gate configurations that can be modeled within TUFLOW including operational gate structures.
- See Mitch’s document for sluice
- List the types of sluices/gates – with pictures & how you would digitise each.
- Overtopping of sluice & including operation of ‘weir’/sluice gate
Gated Drowned Rectangular Culverts (RO)
- under construction
Sluice Gates
- under construction
Types of Sluice Gates
- under construction
Gated Spillways
- under construction
Any further questions please email TUFLOW support: support@tuflow.com