Difference between revisions of "TUFLOW Message 1100"

From Tuflow
Jump to navigation Jump to search
 
(2 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
|alt_msg= WARNING 1100 - Structure "a" crest/invert  is below bed of primary downstream channel "b".
 
|alt_msg= WARNING 1100 - Structure "a" crest/invert  is below bed of primary downstream channel "b".
 
|type=[[WARNING]]
 
|type=[[WARNING]]
|message_desc=The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel.
+
|message_desc=The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel. <br>
 +
The following diagrams provide a simplified elevation view of the two cases that trigger this warning: <br> <br>
 +
'''''Structure "a" crest/invert  is below bed of primary upstream channel'''''<br>
 +
[[File:Invert below US channel.png]] <br><br>
 +
'''''Structure "a" crest/invert  is below bed of primary downstream channel'''''<br> <br>
 +
[[File:Invert below DS channel.png]] <br>
 +
<br>
 
|suggestions= For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.  
 
|suggestions= For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.  
  
|prelink=[[TUFLOW_Message_1099|Message 1099]]
 
 
|uplink=[[1xxx_TUFLOW_Messages|1xxx Messages]]
 
|uplink=[[1xxx_TUFLOW_Messages|1xxx Messages]]
|nextlink=[[TUFLOW_Message_1101|Message 1101]]
 
 
}}
 
}}

Latest revision as of 17:52, 23 October 2023

TUFLOW Message
WARNING 1100 - Structure "a" crest/invert is below bed of primary upstream channel "b".

Alternate Message
WARNING 1100 - Structure "a" crest/invert is below bed of primary downstream channel "b".

Message Type
WARNING

Description
The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel.
The following diagrams provide a simplified elevation view of the two cases that trigger this warning:

Structure "a" crest/invert is below bed of primary upstream channel
Invert below US channel.png

Structure "a" crest/invert is below bed of primary downstream channel

Invert below DS channel.png

Suggestions
For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.


Up
Go-up.png 1xxx Messages