Difference between revisions of "TUFLOW Message 0251"

From Tuflow
Jump to navigation Jump to search
 
(2 intermediate revisions by one other user not shown)
Line 6: Line 6:
 
|suggestions=Simulate model with Build 2011-09-AB or higher.  
 
|suggestions=Simulate model with Build 2011-09-AB or higher.  
 
<br>
 
<br>
|prelink=[[TUFLOW_Message_0244|Message 0244]]
+
 
 
|uplink=[[0xxx_TUFLOW_Messages|0xxx Messages]]
 
|uplink=[[0xxx_TUFLOW_Messages|0xxx Messages]]
|nextlink=[[TUFLOW_Message_0252|Message 0252]]
 
 
}}
 
}}

Latest revision as of 11:09, 22 December 2022

TUFLOW Message
ERROR 0251 – Exceeded limit of GIS layers open at any one time.

Alternate Message
NA

Message Type
ERROR

Description
Produced when using Build 2011-09-AA due to the reworking of GIS routines to write output and check SHP layers which was previously limited to 10 input layers in the 2010-10 release. THis limit has been increased to 100 for the 2011-09-AB release.

Suggestions
Simulate model with Build 2011-09-AB or higher.


Up
Go-up.png 0xxx Messages