TUFLOW Message 2044: Difference between revisions

Content deleted Content added
No edit summary
No edit summary
 
Line 9:
This error has been known to occur in situations when an Estry node is linked to a Flood Modeller node, that is also linked to 2D HX cells for TUFLOW builds prior to 2012-05-AE. In these cases, the 1d_to_2d check layer showed the HX cells were incorrectly linking to Estry and Flood Modeller rather than solely to Flood Modeller.
|suggestions=The 2D cell elevation controls when water can "spill" from the 1D to the 2D. Thick breaklines should be used to ensure that this elevation is correctly set in the 2D. This is documented in the tutorial model for 1D/2D linking here: <u>[[Tutorial_M11_001_GIS_Inputs_QGIS#2D_Breaklines | Tutorial Module 11, 2D breaklines]]</u>.<br>
ISISFlood Modeller-TUFLOW models linked via the ISISFlood Modeller-TUFLOW-PIPE link should be simulated with build 2012-05-AE or later where the problem with incorrect linking of nodes has been resolved.