Tute M06 MI 1D bridge Archive: Difference between revisions

Content deleted Content added
Created page with " The following steps are used to create the replacement 1D bridge and weir - ''1d_nwk'' - that will represent the bridge in the 1D domain. We will also modify the 2D domain..."
 
No edit summary
 
(One intermediate revision by one other user not shown)
Line 15:
<li>Open 1d_nwk_M06_weir_001, make it editable and digitise a new channel from upstream to downstream at the bridge location, ensuring that the polyline is snapped to the 1d_nwk_M04_channels_001 and 1d_nwk_M06_bridge_001 nodes as shown below:</li>
[[File:Module06_B2_Weir.png]]
<li>Update the attribute table of the weir channel as per the below figure. Note that the W under the type attribute indicating a weir channel. The -99,999 for the upstream and downstream inverts will use the bed invert of the weir cross section. For more information on the varying other options please refer to the 2010<u>[https://docs.tuflow.com/classic-hpc/manual/latest/ TUFLOW manual section 4.5.4Manual]</u>.</li>
[[File:Module06_B2_Weir_Att.png]]
 
Line 30:
</ol>
==Conclusion==
For Bridge Modelling Option 2, our 2D domain and 1D/2D boundary conditions have been modified and we have added a 1D weir and geometry to model high flows over the road embankment. To prepare the final bridge modelling approach [[Tutorial_Module06Tutorial_Module06_Archive#Bridge_Modelling_Option 3:_2D_Layered_Flow_Constriction | please return to the main page of module 6]].