TUFLOW Output Discussion: Difference between revisions

Content deleted Content added
Line 65:
==How to create a maximum grid for datasets without direct maximum output from a TUFLOW run?==
 
For cumulative datasets without direct maximum output (e.g., cumulative infiltration, cumulative rainfall etc), ensure that the map output interval in the TCF matches the simulation end time (in seconds). The end time output is when the maximum occurs for cumulative datasets, as it represents the cumulative results over the entire simulation duration.
 
For non-cumulative datasets without direct maximum output (e.g., Froude number, rainfall rate etc):
Line 77:
*Convert the resulting dataset to a preferred grid format for GIS use using the <u>[[TUFLOW_to_GIS#Introduction | TUFLOW to GIS]]</u> utility.
 
:Note: For non-cumulative datasets, this method dependsdoes onnot capture the chosentrue map output intervalsmaximum, andhowever truecan maximumsbe mayclose notenough bewith captureda iffine themap intervals are toooutput largeinterval.