TUFLOW 2D Hydraulic Structures: Difference between revisions
Content deleted Content added
Line 89:
[[File:Eq_flc_portion.png |430px]]
</ol>
*METHOD C (Recommended): this approach combines the CUMULATE and PORTION approaches by utilising CUMULATE through to the top of Layer 3 and PORTION above Layer 3.
<ol>
[[File:Eq_flc_methodC.png |520px]]
| |||