Flood Modeller Tutorial Module02 Provisional: Difference between revisions
Content deleted Content added
Line 70:
*Two 2d_mat layers are created to represent changes to the land use at the location of the proposed development.
Next, the TGC is updated as described below:<ol>
<li>Begin by opening <b>FMT_M01_001.tgc</b> in
<li> Open <b>FMT_M02_001.tgc</b>.
<li>We will now add the commands to modify the topography to represent the proposed development. Add the following commands after the READ GIS Z Shape line:
Line 93:
<ol>
<li>Open <b>FMT_M01_001.ecf</b> in
<li> Open <b>FMT_M02_001.ecf</b><br>
<li> Add the following commands at the bottom of the file as follows:
Line 119:
Next, update the TBC to include a 2d_sa layer that defines inflows into the pipe network.
<ol>
<li>Open <b>FMT_M01_001.tbc</b> in
<li>Insert the following commands after the existing <font color="blue"><tt>Read GIS SA</tt></font><font color="red"><tt> ==</tt></font> mi\2d_sa_M01_002_R.SHP command:<br>
<u>'''QGIS - SHP'''</u><br>
| |||