Check Files 1d hydroprop: Difference between revisions

Content deleted Content added
No edit summary
No edit summary
Line 18:
For some new structures this is the Cd coefficient.
|-
| Elev_at_Top||The highest elevation in the channel, for an open channel, this is the high point in the cross-section. For a structure the average channel obvert is reportedoutput (calculated by adding the pipe height to the upstream and downstream invert levels and taking the average). Note that the water level can rise above this. See the .ecf command <font color="blue"><tt>Depth Limit Factor</tt></font> == for more information on this.
|-
| Depth||The depth of the channel at the top elevation (see above).