Difference between revisions of "1D Weirs"

From Tuflow
Jump to navigation Jump to search
m
Line 13: Line 13:
  
 
==Weir types that can be used within TUFLOW==
 
==Weir types that can be used within TUFLOW==
 
+
*''under construction''
 
<br>
 
<br>
 
*Broad-crested weir
 
*Broad-crested weir
Line 25: Line 25:
  
 
=Operational Control=
 
=Operational Control=
*to be filled out
+
*''under construction''
  
 
=Typical check files used=
 
=Typical check files used=
 
+
*''under construction''
 
<br>
 
<br>
 
<br>
 
<br>
 
Any further questions please email TUFLOW support: [mailto:support@tuflow.com support@tuflow.com]
 
Any further questions please email TUFLOW support: [mailto:support@tuflow.com support@tuflow.com]

Revision as of 22:03, 11 March 2016

Page Under Construction


Introduction


  • List all the weir possibilities coded into TUFLOW and the equations used for each (see Manual)
  • Picture of each weir – note that there may be slight differences in weirs even though they will use the same equation.
  • Theory of submerged and non-submerged flow behind each weir
  • Irregular shaped weir – how to set up
  • Operational weirs – logic control & examples

Weir types that can be used within TUFLOW

  • under construction


  • Broad-crested weir
  • Crump weir
  • Ogee-crested weir
  • Rectangular weir
  • Trapezoidal or Cippoletti weir
  • V-notch weir
  • Spillway

Weir in Bath UK.jpg

Operational Control

  • under construction

Typical check files used

  • under construction



Any further questions please email TUFLOW support: support@tuflow.com