TUFLOW XMDF Specification: Difference between revisions

Content deleted Content added
Created page with "This page describes the XMDF file structure written by TUFLOW. The <u><b>[https://en.wikipedia.org/wiki/XMDF XMDF format]</b></u> is an open format originally developed by Aqu..."
 
No edit summary
 
(12 intermediate revisions by one other user not shown)
Line 1:
This page describes the XMDF file structure written by TUFLOW. The <u><b>[https://en.wikipedia.org/wiki/XMDF XMDF format]</b></u> is an open format originally developed by Aquaveo and the general XMDF specifications are not described here,. however it is important to note that XMDF uses a directory like structure which TUFLOW utilises when writing outputs.
 
===Important Notes===
* XMDF uses a directory like structure which TUFLOW utilises when writing outputs.
* XMDF supports <b>Scalar</b> and <b>Vector</b> type outputs.
** Scalar outputs contain a single value per node (depth, water level, etc)
** Vector outputs contain 2 values per node, an X and Y component (velocity, unit flow, etc)
 
===Specification===
Examples are given below of XMDF outputs from TUFLOW.
 
====Standard Outputs====
<pre>
Maximums/Water Level
Num of Times: 1
0.000
 
Maximums/Depth
Num of Times: 1
0.000
 
Maximums/Vector Velocity
Num of Times: 1
0.000
 
Temporal/Water Level
Num of Times: 7
0.000
0.500
1.000
1.500
2.000
2.500
3.000
 
Temporal/Depth
Num of Times: 7
0.000
0.500
1.000
1.500
2.000
2.500
3.000
 
Temporal/Vector Velocity
Num of Times: 7
0.000
0.500
1.000
1.500
2.000
2.500
3.000
 
Times/Time of Peak h
Num of Times: 1
0.000
</pre>
 
====Time Output Cutoff Depth====
<pre>
Times/Duration Above Depth 0.500m
Num Times 1
0.000
 
Times/Duration Above Depth 1.000m
Num of Times: 1
0.000
 
Times/Time of First Depth > 0.500m
Num of Times: 1
0.000
 
Times/Time of First Depth > 1.000m
Num of Times: 1
0.000
</pre>
 
====Time Output Cutoff VxD====
<pre>
Times/Duration Above Z0 0.500m2ps
Num of Times: 1
0.000
 
Times/Duration Above Z0 1.000m2ps
Num of Times: 1
0.000
 
Times/Time of First VxD > 0.500m2ps
Num of Times: 1
0.000
 
Times/Time of First VxD > 1.000m2ps
Num of Times: 1
0.000
</pre>
 
====Time Output Cutoff <Hazard>====
<pre>
Times/Duration Above ZAEM1 1.000
Num of Times: 1
0.000
 
Times/Duration Above ZAEM1 2.000
Num of Times: 1
0.000
 
Times/Time of First ZAEM1 > 1.
Num of Times: 1
0.000
 
Times/Time of First ZAEM1 > 2.
Num of Times: 1
0.000
</pre>
 
====GLO Outputs====
<pre>
Gauge Levels/GL 50.00 (000:44)/Water Level
Num of Times: 1
0.000
 
Gauge Levels/GL 50.00 (000:44)/Depth
Num of Times: 1
0.000
 
Gauge Levels/GL 50.00 (000:44)/Vector Velocity
Num of Times: 1
0.000
 
Gauge Levels/GL 51.00 (000:58)/Water Level
Num of Times: 1
0.000
 
Gauge Levels/GL 51.00 (000:58)/Depth
Num of Times: 1
0.000
 
Gauge Levels/GL 51.00 (000:58)/Vector Velocity
Num of Times: 1
0.000
 
Gauge Levels/GL 52.00 (001:16)/Water Level
Num of Times: 1
0.000
 
Gauge Levels/GL 52.00 (001:16)/Depth
Num of Times: 1
0.000
 
Gauge Levels/GL 52.00 (001:16)/Vector Velocity
Num of Times: 1
0.000
</pre>
 
{{Tips Navigation
|uplink=[[TUFLOW_Modelling_Guidance | Back to TUFLOW Modelling Guidance]]
}}