Tutorial Module10 Archive: Difference between revisions
Content deleted Content added
Anne.Kolega (talk | contribs) m →Introduction: e.g. |
|||
| (2 intermediate revisions by 2 users not shown) | |||
Line 4:
This tutorial focuses on demonstrating various Scenario and Event management options. In TUFLOW terminology:
* Scenario = A topographic or model configuration feature. <br>
:(
* Event = An input associated with a forcing boundary condition. Examples include: <br>
:* Event magnitude: (
:* Storm duration (
:* Design storm temporal pattern (
:* Tail water condition (
In previous tutorials, new TUFLOW Control File (TCF), TUFLOW Geometry Control (TGC) file and ESTRY Control Files (ECF) were required each time a different model scenario or event was modelled. During complex modelling projects this has the potential to result in a large number of input files. This can become a project management challenge. TUFLOW incorporates scenario and event control logic to overcome these challenges, significantly reducing the number of simulation files required during a complex project. The figure below shows a project requiring over 30 simulations consolidated into a single TCF file.<br>
Line 593:
==Results==
Using the methods described above in the <u>[[Tutorial_Module01_Archive#Viewing_Results | Viewing Results]]</u> section of Module 1.
* Check the simulation logs in the
* View the results in your preferred package.
Do the logs and results appear different to the TUFLOW Classic simulation?
Line 612:
</ol>
<br>
If you experience an issue that is not detailed above please send an email to [mailto:support@tuflow.com support@tuflow.com]<br>
| |||