TUFLOW Message 2118: Difference between revisions

Content deleted Content added
No edit summary
No edit summary
 
(5 intermediate revisions by 4 users not shown)
Line 1:
{{TUFLOW_Message
|tuflow_message=CHECK 2118 - Lowered SX ZC Zpt by <change in 2C cell elevation in metres>m to 1D node bed level.
|alt_msg=WARNING 2118 - Lowered SX ZC Zpt by <change in 2C cell elevation> to 1D node bed level.
|alt_msg=NA
|type=[[CHECK]] <br> [[WARNING]]
|message_desc=Lowered SX ZC Zpt to 1D node bed level. This message only appears in the _message.mif file and is associated with a special 2D cell style (<u>wjs - in the description from the access database, there was a ??? here, was this on purpose</u>).<br>
 
A "Z" flag has been used atoto adjust the ZC elevation at each cell at/along the 2D SX object to below the 1D node bed elevation where ZC is higher. The ZC elevation is set to the Cell Wet/Dry Depth below the 1D node bed. It is not recommended to use the Z flag without first checking that the reason for the discrepancy in elevations between 1D and 2D domains is appropriate.<br>
 
The "Z" flag lowers only the cell centre (ZC) and if used inappropriately can result in stability issues if there is a discrepancy between 1D node and surrounding 2D elevations.<br>
 
|suggestions=Check elevation at 1D node and 2D cells, if a large discrepancy exists, review levels. For example a 1D pit with an elevation (from survey) maybe significantly below the elevation in the DEM. Using a SX connection with a Z flag will lower the cell centre to below the 1D level, but will not lower a flow-path into pit and may cause stability issues.
The message switches from a CHECK to a WARNING at 0.3m (or 1 ft if using English Units) to draw further attention to large changes that may indicate potential erroneous inconsistency between the pit/channel level and the ZC ground level.<br>
|discussion_page=* [[Talk:TUFLOW Message 2118|Discuss Message 2118]]
|suggestions=Check elevation at 1D node and 2D cells, if a large discrepancy exists, review levels. For example a 1D pit with an elevation (from survey) maybe significantly below the elevation in the DEM. Using a SX connection with a Z flag will lower the cell centre to below the 1D level, but will not lower a flow-path into pit and may cause stability issues. To lower flow path into the pit, Z shape polygon can be used.
|link3=''
 
|link4=''
|prelink=[[TUFLOW_Message_2117|Message 2117]]
|uplink=[[2xxx_TUFLOW_Messages|2xxx Messages]]
|nextlink=[[TUFLOW_Message_2119|Message 2119]]
}}