TUFLOW Message 0251: Difference between revisions

From Tuflow
Jump to navigation Jump to search
Content deleted Content added
Created page with '{{TUFLOW_Message |tuflow_message=ERROR 0251 – Exceeded limit of GIS layers open at any one time. |alt_msg=NA |type=ERROR |message_desc=???? |suggestions=???? |discussion_pa...'
 
No edit summary
Line 3: Line 3:
|alt_msg=NA
|alt_msg=NA
|type=[[ERROR]]
|type=[[ERROR]]
|message_desc=Produced when using Build 2011-09-AA due to the reworking of GIS routines to write output and check SHP layers which was previously limited to 10 input layers in the 2010-10 release. THis limit has been increased to 100 for the 2011-09-AB release.
|message_desc=????
|suggestions=????
|suggestions=Simulate model with Build 2011-09-AB or higher.
|discussion_page=* [[Talk:TUFLOW Message 0251|Discuss Message 0251]]
|discussion_page=* [[Talk:TUFLOW Message 0251|Discuss Message 0251]]
|link3=''
|link3=''

Revision as of 15:35, 16 September 2014

TUFLOW Message
ERROR 0251 – Exceeded limit of GIS layers open at any one time.

Alternate Message
NA

Message Type
ERROR

Description
Produced when using Build 2011-09-AA due to the reworking of GIS routines to write output and check SHP layers which was previously limited to 10 input layers in the 2010-10 release. THis limit has been increased to 100 for the 2011-09-AB release.

Suggestions
Simulate model with Build 2011-09-AB or higher.


Up
0xxx Messages