FM Tute M01 MI 1D2D Links: Difference between revisions
Content deleted Content added
Steph.dufour (talk | contribs) No edit summary |
Steph.dufour (talk | contribs) |
||
Line 13:
<li>Note that where there are junctions within the Flood Modeller 1D model (i.e. at structures), both the upstream and downstream nodes are connected to TUFLOW. The HX
In the figure below, the HX lines are broken between FC01.35 and FC01.34 as a culvert is located between these nodes.
<br>
| |||