FM Tute M01 QGIS 1D2D Links: Difference between revisions
Content deleted Content added
Line 16:
[[File:FMT 1D-2D Linking.JPG|600px]]
<br>
The HX lines must be broken between the nodes. This is a requirement of a linked Flood Modeller – TUFLOW model.
In the figure below, the HX lines are broken between FC01.35 and FC01.34 as a culvert is located between these nodes.
<br>
| |||