FM Tute M01 QGIS 1D2D Links: Difference between revisions
Content deleted Content added
Andrew.Sims (talk | contribs) |
Andrew.Sims (talk | contribs) |
||
Line 26:
<br>
Note that where there are junctions within the Flood Modeller 1D model (i.e. at structures), both the nodes immediately upstream and downstream must be connected to TUFLOW. Refer to the below figure where the junctions are circled in
In the example below, the HX lines are broken between FC01.35 and FC01.34 as a culvert is located between these nodes.
<br>
| |||