FM Tute M01 QGIS 1D2D Links: Difference between revisions

Content deleted Content added
Line 26:
 
<br>
Note that where there are junctions within the Flood Modeller 1D model (i.e. at structures), both the nodes immediately upstream and downstream must be connected to TUFLOW. Refer to the below figure where the junctions are circled in redblue and the upstream and downstream RIVER units are circled in greenyellow. The HX lines must be broken between the junctions as this is a requirement of a linked Flood Modeller – TUFLOW model. <br>
In the example below, the HX lines are broken between FC01.35 and FC01.34 as a culvert is located between these nodes.
<br>