MIKE Flood to TUFLOW: Difference between revisions
Content deleted Content added
Ellis Symons (talk | contribs) |
Ellis Symons (talk | contribs) |
||
Line 122:
The Upstream boundary can be digitised in TUFLOW as a 2d_bc (type ‘HT’), or as a 2d_SA polygon. For more discussion on selecting an appropriate upstream boundary type, please see the [[#Discussion|Discussion Section]] at the bottom of the page.
''Note: TUFLOW does not require pre-wetting of the upstream boundary. Terrain modifications and initial water level conditions are not required to be converted across to TUFLOW for these cases.''
===TUFLOW Commands===
| |||