TUFLOW 1D2D SX Advice: Difference between revisions

Content deleted Content added
Line 26:
* The 1D/2D link associated with the 1m 2D cell size is not stable.
* The flow rate results through the 1D culvert decrease with cell size. This is an issue. It indicates cell size convergence (i.e. consistent results independent of cell size) was not achieved. This is caused by the 2D storage volume associated with the 1D/2D connection being insufficient compared to the flow area associated with the 1D channel (12m width). As a result, the 2D boundary cell is the model feature limiting flow exchange between the 1D and 2D, rather than the dimension and hydraulics associated with the 1D structure.
''Please note that thea culvert connection of the culvert to onlya onesingle 2D cell is provided here as an example. ItConnections iswith not recommended to use lessa 2D cell width (widthless required acrossthan the culvertstructure face) thanwidth inis thenot linked culvertsrecommended. For example, a 12m wide set of culverts should be connected to at minimum,least 12x1m12 ,6x2mx and 3x5m1m cells, respectively.6 Ifx in2m yourcells ownand model3 you'rex unsure,5m thencells wecells suggestrespectively. tryingExamples ahow couplethis ofcan cellbe widthdone connectionsare andshown checkingin for anythe resultfollowing sensitivitysections.'' <br>
 
=1D Timestep=