This page summarizes recommended approach for processing a large amount of ARR 2016 ensembles.
==Introduction==
The ARR 2016 guidelines require the use of ten temporal patterns to be applied for each design Annual Exceedance Probability (AEP) and storm duration combination. This multiplies the number of design simulations by ten and requires additional processing in comparison with the previous approach recommended in ARR 1987. As a consequence, the model result folders can get very large and the post processing of the results can be time intensive. The below page provides recommendations to minimise the effort and footprint of running TUFLOW for the latest ARR 2016 guidelines.