InfoWorks ICM to TUFLOW: Difference between revisions
Content deleted Content added
Tuflowduncan (talk | contribs) |
Tuflowduncan (talk | contribs) |
||
Line 49:
! style="background-color:#005581; font-weight:bold; color:white;" width=25% | TUFLOW File
! style="background-color:#005581; font-weight:bold; color:white;" width=50% | Notes
|-
|1D Node ||Node||1d_mh_pit||Headloss Approach is assumed to be TUFLOW’s default Engelund approach.
Line 58 ⟶ 57:
|-
|1D Structures ||Bridge||1d_nwk_Bridges||Bridge methods are different so the bridge would need to be rebuilt in TUFLOW/Estry. Only the link geometry is exported.
|-
|}
To run the script, you’ll again need to run InfoWorks ICM with a viewer licence or greater. With the desired network in the geoplan, go to '''Network->Run Ruby Script'''. Navigate to and select the ruby script, in the below this is ICM_Out_to_shp_1.rb.
| |||