TUFLOW Message 1103: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
|suggestions=Ensure GIS attributes for a 1d_nwke layer match with the empty file (1d_nwke_empty) as written by TUFLOW. |
|suggestions=Ensure GIS attributes for a 1d_nwke layer match with the empty file (1d_nwke_empty) as written by TUFLOW. |
||
|prelink=[[TUFLOW_Message_1102|Message 1102]] |
|||
|uplink=[[1xxx_TUFLOW_Messages|1xxx Messages]] |
|uplink=[[1xxx_TUFLOW_Messages|1xxx Messages]] |
||
|nextlink=[[TUFLOW_Message_1104|Message 1104]] |
|||
}} |
}} |
||
Revision as of 15:12, 22 December 2022
TUFLOW Message
ERROR 1103 - Must have ten extra attributes appended to 1d_nwk layer to use the weir over the top option.
Alternate Message
NA
Message Type
ERROR
Description
If using the extended (1d_nwke) attributes, which allows automatic weir over the top of structures, the additional GIS attributes as per Table 4.15 1D Model Network (1d_nwke) OPTIONAL Attribute Descriptions in the TUFLOW manual (2010) version.
Suggestions
Ensure GIS attributes for a 1d_nwke layer match with the empty file (1d_nwke_empty) as written by TUFLOW.
| Up |
|---|