QGIS ARR to TUFLOW: Difference between revisions

Content deleted Content added
Line 141:
The user can choose to output the complete storm (preburst + design burst) rather than just the design burst by checking on the following option:<br>
[[File: ARR_complete_storm_checkbox.PNG | 300px]]<br>
The tool will use the preburst depth from the '''Preburst percentile''' option and the user will be required to select a preburst temporal pattern from the followingoptions listed below. The options below have been included at the request of users and are not a direct reference to any specific methodology outline in ARR. If you would like to see another method included, please email <b><u>[mailto:support@tuflow.com support@tuflow.com]</u></b>. Currently the ARR to TUFLOW tool supports the following preburst temporal pattern methods:
* '''Constant Rate''' - This will apply the preburst depth equally over a given time period. The time period can be specified as an absolute time (either as minutes or hours) or proprotional to the design storm e.g. a proportional value of 0.5 will apply a 30 min preburst to a 1 hr storm and a 15 min preburst to a 30 min storm.
* '''Temporal Pattern''' - This will apply the preburst depth using a temporal pattern obtained from the datahub for a given duration. The preburst duration can either be an absolute time or be proportional to the design storm. The user will need to select which temporal pattern to use (e.g. TP01, TP02,... TP10). Note: there is a minimum preburst duration of 10 min for this method.