Tute M06 MI 1D bridge Archive: Difference between revisions
Content deleted Content added
Created page with " The following steps are used to create the replacement 1D bridge and weir - ''1d_nwk'' - that will represent the bridge in the 1D domain. We will also modify the 2D domain..." |
No edit summary |
||
Line 30:
</ol>
==Conclusion==
For Bridge Modelling Option 2, our 2D domain and 1D/2D boundary conditions have been modified and we have added a 1D weir and geometry to model high flows over the road embankment. To prepare the final bridge modelling approach [[
| |||