Tute M06 MI 1D bridge Archive: Difference between revisions
Content deleted Content added
No edit summary |
No edit summary |
||
Line 15:
<li>Open 1d_nwk_M06_weir_001, make it editable and digitise a new channel from upstream to downstream at the bridge location, ensuring that the polyline is snapped to the 1d_nwk_M04_channels_001 and 1d_nwk_M06_bridge_001 nodes as shown below:</li>
[[File:Module06_B2_Weir.png]]
<li>Update the attribute table of the weir channel as per the below figure. Note that the W under the type attribute indicating a weir channel. The -99,999 for the upstream and downstream inverts will use the bed invert of the weir cross section. For more information on the varying other options please refer to the
[[File:Module06_B2_Weir_Att.png]]
| |||