TUFLOW Message 2365: Difference between revisions

Content deleted Content added
m Protected "TUFLOW Message 2365" ([edit=sysop] (indefinite) [move=sysop] (indefinite))
No edit summary
Line 4:
|type=[[WARNING]]
|message_desc=Water level at '''HQ''' boundary has exceeded the top of the defined stage (H) V's flow (Q) relationship.
|suggestions=If a stage-discharge relationship has been defined consider extending this relationship for higher water levels. If a stage-discharge relationship is calculated by TUFLOW by defining a water surface slope, the boundaryautomatic shouldHQ berelationship extendedextends to higherthe groundhighest elevation along the HQ line (the HQ relationship calculated by TUFLOW is outputted to the _2d_bc_tables.csv file).
<br><br>
To extend the level that the HQ relationship is calculated for an automatic HQ boundary there are two options:
The 2d_bc “d” attribute can be used to set the maximum depth of the automatically generated HQ curve (note d is a depth, not an elevation).<br>
* Extend the HQ line to higher grounds;
* The 2d_bc “d” attribute can be used to set the maximum depth of the automatically generated HQ curve (note d is a depth, not an elevation).<br>
 
Note the second option assume glass walls at the edges of the HQ line (no additional flow area to the sides).
<br><br>
See also this post on the TUFLOW forum:<br>
[http://www.tuflow.com/forum//index.php?showtopic=943 WARNING 2365 - Exceeded top of HQ curve.]