TUFLOW SWMM Tutorial M01: Difference between revisions

Content deleted Content added
Line 13:
 
== QGIS ==
QGIS Version 3.34 or newer, and QGIS TUFLOW Plugin 3.9.0.49110 or newer are required to access the SWMM Processing Tools described in the following sections. For installation, see <u>[https://wiki.tuflow.com/index.php?title=TUFLOW_QGIS_Plugin#Installation_of_Plugin Installation of TUFLOW Plugin]</u>.<br>
Firstly, define the Coordinate Reference System (CRS), also called ‘Projection’, for the QGIS workspace:
<ol>