FM Tute M01 ARC 1D2D Links: Difference between revisions
Content deleted Content added
Andrew.Sims (talk | contribs) No edit summary |
Andrew.Sims (talk | contribs) No edit summary |
||
Line 10:
In the figure below, the water level is calculated in Flood Modeller at the nodes FC01.16, FC01.15 and FC01.14. These water levels are linearly interpolated along the lengths of the HX line on both left and right banks of the watercourse. When the water level exceeds the ZC elevation of the boundary cell, water is able to flow on the the TUFLOW 2D floodplain. <br>
<br>
[[File:FMT 1D-2D Linking.JPG|600px]]
<li>Note that where there are junctions within the Flood Modeller 1D model (i.e. at structures), both the upstream and downstream nodes are connected to TUFLOW. The HX lines are broken between the nodes. This is a requirement of a linked Flood Modeller – TUFLOW model. </li>
| |||