MIKE Flood to TUFLOW: Difference between revisions
Content deleted Content added
Ellis Symons (talk | contribs) |
Ellis Symons (talk | contribs) |
||
Line 121:
The Upstream boundary can be digitised in TUFLOW as a 2d_bc (type ‘HT’), or as a 2d_SA polygon. For more discussion on selecting an appropriate upstream boundary type, please see the [[#Discussion|Discussion Section]] at the bottom of the page.
===TUFLOW Commands===
The upstream boundary can now be input into the TBC using the following command, depending on which inflow method was decided on:
<font color='green'><tt>! Set model boundary</tt></font><br>
<font color='blue'><tt>Read GIS BC</tt></font> <font color='red'><tt>==</tt></font> <tt>..\model\gis\''<Upstream BC Boundary>''.shp</tt>
''or''
<font color='blue'><tt>Read GIS SA</tt></font> <font color='red'><tt>==</tt></font> <tt>..\model\gis\''<SA Boundary>''.shp</tt>
==Source Boundaries==
| |||