MIKE Flood to TUFLOW: Difference between revisions
Content deleted Content added
Chris Huxley (talk | contribs) |
Chris Huxley (talk | contribs) |
||
Line 119:
* Viewing <b>Item</b> which corresponds to the boundary name<br>[[File: MIKE21-HP-Boundary-Names.PNG|750px|]]
The Upstream boundary can be digitised in TUFLOW as a 2d_bc (type
''Note: TUFLOW does not require pre-wetting of the upstream boundary. Terrain modifications and initial water level conditions are not required to be converted across to TUFLOW for these cases.''
| |||