HPC Introduction: Difference between revisions

Content deleted Content added
Line 20:
* Wet and dry independently of the cell wetting or drying (see Cell Wet/Dry Depth). This allows for the modelling of “thin” obstructions such as fences and thin embankments relative to the cell size (eg. a concrete levee).
ZH points:
* Play no role hydraulically. thisThis poi8ntpoint location is used for output processing;
* The only elevations written to the SMS .2dm mesh file (by default, binary output is interpolated/extrapolated to the cell corners).