Difference between revisions of "ARR 2019 Ensembles Processing"

From Tuflow
Jump to navigation Jump to search
Line 5: Line 5:
 
This page summarizes recommended approach for processing a large amount of ARR 2016 ensembles.
 
This page summarizes recommended approach for processing a large amount of ARR 2016 ensembles.
 
==Introduction==
 
==Introduction==
The ARR 2016 guidelines implemented ten temporal patterns for each annual exceedance probability (AEP) and duration. This multiplies the number of simulations by ten and requires additional processing in comparison with ARR 1987. The results files can get very large, processing can be time intensive and the creation of the processing tools can be tedious work.
+
The ARR 2016 guidelines implemented ten temporal patterns which are to be applied for each annual exceedance probability (AEP) and duration. This multiplies the number of simulations by ten and requires additional processing in comparison with ARR 1987. The results files can get very large, the creation of the processing tools can lead to tedious work and the actual processing can be time intensive.

Revision as of 13:49, 11 September 2018

Page Under Construction

This page summarizes recommended approach for processing a large amount of ARR 2016 ensembles.

Introduction

The ARR 2016 guidelines implemented ten temporal patterns which are to be applied for each annual exceedance probability (AEP) and duration. This multiplies the number of simulations by ten and requires additional processing in comparison with ARR 1987. The results files can get very large, the creation of the processing tools can lead to tedious work and the actual processing can be time intensive.