ARR 2019 Ensembles Processing: Difference between revisions

Content deleted Content added
No edit summary
Line 5:
This page summarizes recommended approach for processing a large amount of ARR 2016 ensembles.
==Introduction==
The ARR 2016 guidelines implementedrequire the use of ten temporal patterns which are to be applied for each annualdesign exceedanceAnnual probabilityExceedance Probability (AEP) and each storm duration combination. This multiplies the number of design simulations by ten and requires additional processing in comparison with the previous approach recommended in ARR 1987. The resultsresult files can get very large, the creation of the processing tools can lead to tedious work and the computerised processing can be time intensive.
==Choice of Output==
As the model results might get large in size the preferred method to process the ensembles is to use FLT grid output format to export the maximums of required values (water level, depth, velocity, hazard, ...) directly from TUFLOW simulation. FLT files are ESRI binary (float) version of the ASC files and their size is about 1/5 of an ASC file. Binary files can also be processed faster by TUFLOW utilities.<br>