Flood Modeller Tutorial Module02: Difference between revisions
Content deleted Content added
Tuflowduncan (talk | contribs) |
Tuflowduncan (talk | contribs) |
||
Line 46:
<li> An "X1DQ" link means a Flood Modeller inflow/outflow is being applied at the ESTRY node (ie. Flood Modeller sends ESTRY a +/- flow and ESTRY sends back a water level). </li>
<li> An ESTRY X1DH (the default) would be used for most Flood Modeller ESTRY links. An X1DQ might be more appropriate where a Flood Modeller model stops and flows into an ESTRY model.<br>
Generally, an ESTRY timestep will be smaller than the Flood Modeller timestep. In these cases, the total volume is accumulated over all ESTRY timesteps within a Flood Modeller timestep, and applied to the Flood Modeller model as a discharge by dividing the volume by the Flood Modeller timestep.
The mass balance _MB1D.csv file includes four new columns:
| |||