Tutorial M05 Results QGIS: Difference between revisions

Content deleted Content added
Line 28:
=Conclusion=
:*Both the 1D and 2D results were viewed confirming the the pipe network was getting flows through the pit 1D/2D links and the water was discharging from the downstream pipe to the 2D domain.
:*For further functionality, see <u>[[TUFLOW_Viewer | TUFLOW Viewer]]</u>.
<br>
{{Tips Navigation