TUFLOW Message 1100: Difference between revisions

From Tuflow
Jump to navigation Jump to search
Content deleted Content added
No edit summary
No edit summary
Line 3: Line 3:
|alt_msg= WARNING 1100 - Structure "a" crest/invert is below bed of primary downstream channel "b".
|alt_msg= WARNING 1100 - Structure "a" crest/invert is below bed of primary downstream channel "b".
|type=[[WARNING]]
|type=[[WARNING]]
|message_desc=The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel.
|message_desc=The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel. <br>
The following diagrams provide a simplified elevation view of the two cases that trigger this warning: <br>
'''''Structure "a" crest/invert is below bed of primary upstream channel'''''<br>
[[File:Invert below US channel.png]] <br><br>
'''''Structure "a" crest/invert is below bed of primary downstream channel'''''<br>
[[File:Invert below DS channel.png]] <br>
<br>
|suggestions= For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.
|suggestions= For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.



Revision as of 10:38, 23 October 2023

TUFLOW Message
WARNING 1100 - Structure "a" crest/invert is below bed of primary upstream channel "b".

Alternate Message
WARNING 1100 - Structure "a" crest/invert is below bed of primary downstream channel "b".

Message Type
WARNING

Description
The WARNING is issued where a 1D structure’s invert/bed lies below the invert/bed of the primary upstream and/or downstream channel.
The following diagrams provide a simplified elevation view of the two cases that trigger this warning:
Structure "a" crest/invert is below bed of primary upstream channel


Structure "a" crest/invert is below bed of primary downstream channel


Suggestions
For Build 2013-12-AB onwards, if this WARNING is issued, a review of the 1D topography and structure invert/dimensions is recommended. For Build 2013-12-AA, the issuing of this warning is incorrect and has no effect on the results.


Up
1xxx Messages