TUFLOW SWMM Tutorial M02 Check QGIS: Difference between revisions

Content deleted Content added
Line 53:
[[File:integrity_tool_overview.PNG]]<br>
<br>'''1. Input Network Lines''' - Select '''Link--Conduits'''. Use dropdown box and '+' button to add layers as inputs to tool.<br>'''2. Input Network Points''' - Select '''Nodes--Junctions''' and '''Node--Outfalls'''. Use dropdown box and '+' button to add layers as inputs to tool.<br>'''3. Input Tables''' - Not used for SWMM data review.<br>'''4. Input DEM''' - Select '''TS02_5m_001_DEM_Z'''.<br>'''5. Tool Selection''' - The active tab will determine the active tool. See [[#Tool_Documentation|Tool Documentation]] for information on each tool.<br>'''6. Status Bar''' - Contains the progress bar and status of the integrity tool. Includes information such as the current active task being performed (if one of the tools is running), and the status of the previously run tool.<br>'''7. Run''' - Runs the currently active tool (active tool determined by the current active tool tab - prior to plugin version 3.2 a radio button was used to select the active tool).
<br>
 
<br>
<br>The following example demonstrates use of the Flow Trace tool to create a profile plot for data input review.
 
'''<<video>>'''