TUFLOW SWMM Tutorial M02: Difference between revisions
Content deleted Content added
Chris Huxley (talk | contribs) |
|||
Line 2:
This tutorial, Module 2 of the TUFLOW SWMM tutorial dataset will demonstrate how to model underground stormwater pipe networks using SWMM, linked to the TUFLOW HPC 2D solution scheme. <br> TUFLOW SWMM Tutorial Module 2 builds from the model created in <u>[[TUFLOW_SWMM_Tutorial_M01|TUFLOW SWMM Tutorial Module 1]]</u>. The completed TUFLOW SWMM Module 1 model is provided in the '''''TUFLOW_SWMM_Module_02\TUFLOW''''' folder of the download dataset as the starting point for this tutorial. If you are not already familiar with TUFLOW SWMM linking, we recommend first completing Module 1 before this tutorial. <br>
=
QGIS Version 3.34 or newer, and QGIS TUFLOW Plugin 3.9.0.49 or newer are required to access the SWMM Processing Tools described in the following sections. For installation, see <u>[https://wiki.tuflow.com/index.php?title=TUFLOW_QGIS_Plugin#Installation_of_Plugin Installation of TUFLOW Plugin]</u>.<br>
Define the Coordinate Reference System (CRS), also called ‘Projection’, for the QGIS workspace:
| |||