TUFLOW 1D Flood Modeller Connectivity: Difference between revisions
Content deleted Content added
No edit summary |
No edit summary |
||
Line 7:
* A "'''X1DQ'''" link where a Flood Modeller inflow/outflow is being applied at the ESTRY node (i.e. Flood Modeller sends ESTRY a discharge and ESTRY sends back a water level).
An ESTRY X1DH (the default) would be used for most Flood Modeller ESTRY links where TUFLOW is discharging into Flood Modeller. The discharge will be applied to the Flood Modeller 1D model as a lateral inflow. The Flood Modeller 1D node on the receiving end of an X1DH connection must be a channel unit (eg, River, Interpolate, Replicate or Conduit) and must not be the end node of a reach (
[[File:X1DH Link.png|thumb|Border|none|700px|Figure 1: TUFLOW Pipe Network Discharging to a Flood Modeller Representation of an Open Channel]]
Line 24:
[[File:Estry Properties.png|thumb|Border|none|700px|Figure 4-1d_nwk_nodes attributes for the ESTRY node snapped to the Flood Modeller node.]]<br>
A connector "X" channel type can be used to connect the end of the linked ESTRY channel to the ESTRY node snapped to the Flood Modeller node if the end of the ESTRY channel and the snapped Flood Modeller /ESTRY nodes are not in the same location. In this case it is important that the X-connector is drawn from the ESTRY channel (
[[File:X Connector.png|thumb|Border|none|700px|Figure 5-X-Connector connected the ESTRY channel DARL_OC_1 to the ESTRY Node DB_2436 which is snapped to the Flood Modeller node DB_2436. Note the direction of the X-Connector between the ESTRY channel and the ESTRY/Flood Modeller node location.]]
| |||