TUFLOW 2D Hydraulic Structures: Difference between revisions

Content deleted Content added
Line 277:
| Thick
| between zero and 1.5 times the cell size
| Half of totalTotal form loss of the bridge
| FLC/2 applied to all sides of the selected cells
| A cell is selected if the polyline intersects the cell crosshair. Caution should be taken when using a "thick" line, as changes in cell size can cause it to become a "wide" line. If this occurs, the FLC attribute should be recalculated to avoid overestimating losses.
|-