FM Tutorial M01 QGIS GPKG 1D2D Links: Difference between revisions

Content deleted Content added
No edit summary
Line 13:
[[File:M04 1d2d 03.png|300px]]
[[File:M04 1d2d 04.png|300px]]
<br>The digitised direction of the HX and CN lines are not important. The CN lines however should be digitised approximately perpendicular to the direction of flow. Two CN lines are digitised for each node and connected to the HX boundary lines along the left and right banks. The HX boundary lines should be digitised along the top of each bank such that the width between the lines approximately correlates to the width of the 1D channel.<br>.
<br>Often HX lines are located along the top of a levee (natural or artificial) or flood defence running along the river bank. When carving a 1D channel through a 2D domain, the HX line must be either on the top of the levee or on the inside of the levee (closest to the channel). If the HX line is located on the other side of the levee away from the channel, the effect of the levee on water flow is <u>'''not'''</u> modelled. In the sections above, it can be seen that the boundary cell is along the levee and the interaction between the channel and the floodplain (1D and 2D) occurs at the correct elevation. <br>
<br>Where there are junctions within the Flood Modeller 1D model (i.e. at structures), both the nodes immediately upstream and downstream must be connected to TUFLOW. The HX lines must be broken between the junctions as this is a requirement of a linked Flood Modeller – TUFLOW model<br>.