FMA Challenge 3: Difference between revisions
Content deleted Content added
No edit summary |
No edit summary |
||
Line 95:
The sections of levee that were overtopped were post-processed using GIS for the 100ft with n=0.2 scenario as illustrated by the magenta lines in the image below. The GIS layer showing the overtopped sections is provided as part of the ftp download.
[[File:FMA3_6.jpg|600px]]
=Conclusion=
| |||