TUFLOW Message 1284

From Tuflow
Revision as of 12:18, 29 January 2025 by Pavlina Monhartova (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

TUFLOW Message
CHECK 1284 - Connecting a 1D H boundary to 2D HX link.

Alternate Message
NA

Message Type
CHECK

Description
A 1D H boundary is connected to 2D HX link.

Suggestions
This situation occur usually at downstream boundaries. Check that the setup is as intended.


Up
Go-up.png 1xxx Messages