Difference between revisions of "Tutorial M08 001 Check Files QGIS"
Jump to navigation
Jump to search
(→Method) |
|||
(One intermediate revision by one other user not shown) | |||
Line 30: | Line 30: | ||
<li>Compare the cells, inspect how the smaller cell size picks up topographic features compared with the larger cell size. <br> | <li>Compare the cells, inspect how the smaller cell size picks up topographic features compared with the larger cell size. <br> | ||
<br> | <br> | ||
− | + | {{Video|name=Animation_M08_001_Check_01.mp4|width=1249}}<br> | |
− | <br> | ||
</ol> | </ol> | ||
Latest revision as of 13:49, 4 January 2024
Introduction
QGIS is used to import the check files and review the grid cell sizes.
TUFLOW Project Re-Configuration
Re-configure the TUFLOW project to use and save empty files to the correct folder:
- Go to Plugins > TUFLOW > Editing > Configure / Create TUFLOW Project.
- Change the folder which contains TUFLOW to the Module_08 folder. This is the only change required, the model folder structure and template empty files are supplied from previous model.
Note: The 'results' and 'check' folder get automatically created when the TUFLOW model is run.
- Click 'OK' and save the QGIS workspace by selecting Project > Save As.
- Set the QGIS workspace projection to EPSG:32760, see Set the Projection.
Method
This tutorial introduces:
Review the check files:
- Open the following files from the Module_08\TUFLOW\check folder:
- M08_10m_001_grd_check_R.shp
- M08_5m_001_grd_check_R.shp
- M08_2.5m_001_grd_check_R.shp
- Use the 'Apply TUFLOW Styles to Open Layers'.
- The grd_check is the 2D grid defined by the 2d_code layer and contains a region object for each cell. It is useful to understand how the model is orientated, the cell size in relation to the hydraulic features and where certain calculations occur in the model. In this tutorial, the grid is orientated to align with the downstream road.
- Compare the cells, inspect how the smaller cell size picks up topographic features compared with the larger cell size.
Conclusion
- The 10m, 5m and 2.5m grids were inspected.
Up |
---|
Back to Module 8 Main Page |