QGIS SWMM Junctions Downstream Junctions to Outfalls: Difference between revisions
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
== Introduction == |
== Introduction == |
||
This tool converts junctions on the downstream side of a network to outfall nodes as required by SWMM. An outfall layer with the converted nodes will be created along with a modified junction layer (outfall nodes removed). The contents of these layers |
This tool converts junctions on the downstream side of a network to outfall nodes as required by SWMM. An outfall layer with the converted nodes will be created along with a modified junction layer (outfall nodes removed). The contents of these layers need to be copied into the appropriate layers in the SWMM GeoPackage.<br> |
||
'''Note:''' This tool relies on the 'From Node' and 'To Node' fields to determine position in the network. The <u>[[QGIS SWMM Conduits Assign Node Fields|Conduits - Assign node fields]]</u> processing tool will ensure the 'From Node' and 'To Node' fields are correctly assigned. |
'''Note:''' This tool relies on the 'From Node' and 'To Node' fields to determine position in the network. The <u>[[QGIS SWMM Conduits Assign Node Fields|Conduits - Assign node fields]]</u> processing tool will ensure the 'From Node' and 'To Node' fields are correctly assigned. |
||
<br> |
<br> |
||
| Line 12: | Line 13: | ||
=== Parameters === |
=== Parameters === |
||
<ol> |
<ol> |
||
<li>'''Input junctions:''' The existing junctions layer |
<li>'''Input junctions:''' The existing junctions layer. |
||
<li>'''Selected features only:''' If |
<li>'''Selected features only:''' If node(s) in the junctions layer have been selected using the 'Select Features' tool, this option will become available. If checked on, the tool will only check the selected node(s). |
||
<li>'''Input conduits:''' The conduits layer to which the |
<li>'''Input conduits:''' The conduits layer containing the channel(s) to which the junction and outfall node(s) are connected. |
||
<li>'''Modified junctions layer:''' Determines the location and filename of the modified junctions layer (outfall |
<li>'''Modified junctions layer:''' Determines the location and filename of the modified junctions layer (outfall node(s) removed). |
||
<li>'''New outfalls layer:''' Determines the location and filename of the new outfalls layer. |
<li>'''New outfalls layer:''' Determines the location and filename of the new outfalls layer. |
||
</ol> |
</ol> |
||
<br> |
<br> |
||
[[File: |
[[File:Junctions_Downstream_Junctions_to_Outfalls_Dialog_c.png]] |
||
<br><br> |
<br><br> |
||
== Example == |
== Example == |
||
<br> |
<br> |
||
{{Video|name= |
{{Video|name=Animation_Junctions_Downstream_Junctions_to_Outfalls_01b.mp4|width=1236}} |
||
<br> |
<br> |
||
Latest revision as of 14:58, 3 May 2024
Introduction
This tool converts junctions on the downstream side of a network to outfall nodes as required by SWMM. An outfall layer with the converted nodes will be created along with a modified junction layer (outfall nodes removed). The contents of these layers need to be copied into the appropriate layers in the SWMM GeoPackage.
Note: This tool relies on the 'From Node' and 'To Node' fields to determine position in the network. The Conduits - Assign node fields processing tool will ensure the 'From Node' and 'To Node' fields are correctly assigned.
Usage
This tool, Junctions - Downstream junctions to outfalls, can be found in the QGIS processing toolbox panel under TUFLOW >> SWMM. To open the Processing Toolbox panel, navigate to 'Processing' in the menubar and select 'Toolbox'.

Parameters
- Input junctions: The existing junctions layer.
- Selected features only: If node(s) in the junctions layer have been selected using the 'Select Features' tool, this option will become available. If checked on, the tool will only check the selected node(s).
- Input conduits: The conduits layer containing the channel(s) to which the junction and outfall node(s) are connected.
- Modified junctions layer: Determines the location and filename of the modified junctions layer (outfall node(s) removed).
- New outfalls layer: Determines the location and filename of the new outfalls layer.
Example
| Up |
|---|
