Difference between revisions of "Tutorial M04 Check Files QGIS"

From Tuflow
Jump to navigation Jump to search
Line 29: Line 29:
 
= Conclusion =  
 
= Conclusion =  
 
:*The DEM_Z and zsh_zpt_check file was used to ensure the cut through was correctly applied to allow flow through the embankment.  
 
:*The DEM_Z and zsh_zpt_check file was used to ensure the cut through was correctly applied to allow flow through the embankment.  
:*The lfcsh_uvpt_check was viewed showing the form losses and blockages applied to the thin line.
+
:*The 2d_bg_uvpt_check was viewed showing the form losses and blockages applied to the thin line.
 
<br>
 
<br>
 
{{Tips Navigation
 
{{Tips Navigation
 
|uplink=[[Tutorial_M04#Check_Files| Back to Module 4 Main Page]]
 
|uplink=[[Tutorial_M04#Check_Files| Back to Module 4 Main Page]]
 
}}
 
}}

Revision as of 16:44, 3 February 2025

Introduction

QGIS is used to import the check files and review the topographic modification cutting through the embankment, and the layered flow constriction.

Method

This tutorial introduces:

Review the check files:

  1. Open the following files from the Module_04\TUFLOW\check folder:
    • M04_5m_002_DEM_Z.tif
    • M04_5m_002_zsh_zpt_check_P.shp
    • M04_5m_002_lfcsh_uvpt_check_P.shp
  2. Use the 'Apply TUFLOW Styles to Open Layers'.
  3. The DEM_Z grid shows the final elevations used for the model calculations. Change the styling and inspect the area of the embankment is lowered. See Module 2 for more information on how to review topographic modifications. Note: The DEM_Z appears different to the input DEM as the resolution of the DEM_Z is coarser (2.5m) than the input file (0.5m).
  4. The zsh_zpt_check file displays the elevation points changed by Z shape topographic update and the TUFLOW styling provides an indication of the elevation difference.



  5. The _2d_bg_uvpt_check file shows the Zpts where the 2d_bg is applied. Only the cell sides have the flow constriction applied. The attribute table shows the values specified in the 2d_bg and the final elevation of the invert level after applying the Z shape.


Conclusion

  • The DEM_Z and zsh_zpt_check file was used to ensure the cut through was correctly applied to allow flow through the embankment.
  • The 2d_bg_uvpt_check was viewed showing the form losses and blockages applied to the thin line.