TUFLOW Message 3519: Difference between revisions
Content deleted Content added
No edit summary |
No edit summary |
||
| (7 intermediate revisions by 5 users not shown) | |||
Line 1:
{{TUFLOW_Message
|tuflow_message=CHECK 3519
|alt_msg=NA
|type=[[CHECK]]
|message_desc=If the DEM's resolution is fine enough, SGS can preserve the flow path along the cells/faces without using any gully line. By default, a gully line applies a gradient along the faces based on the cell corners and
cell side Zpt values, and creates sloping cells using the ZC, ZU, ZV and ZH values. It
|suggestions=Check if "SGS Sample Distance" and resolution of the DEM is fine enough to capture the gully line. If so, the topography modification MIN or GULLY option can be removed.
|uplink=[[3xxx_TUFLOW_Messages|3xxx Messages]]
}}
| |||