Flood Modeller Tutorial Module02: Difference between revisions

Content deleted Content added
No edit summary
Line 60:
*<b>X1DQ V Out</b>: The volume of water out via a X1DQ link.
The type or existence of a connection can be checked by viewing the Conn_1D_2D attribute in the 1d_nwk_N_check layer. The _messages.mif/.shp layer contains CHECK 1393 messages at each ESTRY node linked to a Flood Modeller node.
 
=Modify Simulation Control Files and Set-up a TUFLOW Scenario=
Now that we have made all of the necessary changes to the GIS layers, we need to update our control files to include all the changes representing the proposed development.
 
==TGC File==
There have been two changes to the model that impact the TGC file:
*We have created two layers that together form a 3D TIN representing changes to the ground elevations.
*We have created two 2d_mat layers that represent changes to the land use at the location of the proposed development.
We will also be making the necessary amendments to the control files to incorporate the representation of the bridge in the 'FINB2' scenario into a final 'DEV' scenario.
<br>
<ol>
<li>Begin by opening <b>FMT_M01_001.tgc</b> in your text editor. Save the file as <b>FMT_M02_001.tgc</b>.