Quadtree and Sub-Grid Sampling FAQ: Difference between revisions
Content deleted Content added
Line 41:
=Do I need to use "SXL" option for pits and why my model is causing "pit inlet level" error?=
In non-SGS models, the "SX'''L'''" option is often used to lower the pit ground level to improve flow capture. However, an SGS model creates an evaluation-storage relationship based on underlying DEM and is naturally better at capturing flows at pit inlets. Therefore "SX'''L'''" option is not necessary in an SGS model if the DEM
| |||