Tutorial M05: Difference between revisions
Content deleted Content added
Line 129:
:*1D underground pipes and pits were provided and added to the model discharging into the 2D domain. <br>
:*Check files were used to review the connection between the pipe network and the 2D domain.
:*Results were viewed to assess the amount of water in the pipe network.
<br>
=1D Integrity Tool (Optional)=
| |||